Not much to report today, except:
- ongoing work with kitchen door/panels installation
- the ceiling “spill” lighting was wired up
- first doors installed in upstairs hallway storage unit
- aluminium trim installed in upstairs bathroom doorway (covers the expansion gap between the timber and the tiles)
