The renovations – day 80.

I didn’t get home until late this evening. It was rather dark and I wasn’t expecting to see a lot. How wrong I was!

  • Caesarstone benchtops installed in kitchen
  • cooktop partially installed
  • LED under-cabinet kitchen lighting installed
  • kitchen sink partially installed
  • cabinet installed over pedestal basin in bathroom-laundry
  • shower rail kit installed in bathroom-laundry
  • Caesarstone top installed for upstairs bathroom vanity unit
  • light installed above the mirror cabinet in upstairs bathroom
  • toilet installed in upstairs bathroom (just needs seat fitted)
  • third glass shelf installed in bathroom display nook
  • shower rose installed in upstairs bathroom
  • all cabinets now in place for the the hallway storage unit
  • patching of the new network and antenna connections started in the comms room
Share

Leave a Reply

Your email address will not be published. Required fields are marked *

*

* Copy this password:

* Type or paste password here:

9,747 Spam Comments Blocked so far by Spam Free Wordpress

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>